• Menu
  • Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content

Before Header

BA Systems

Your Smart Solutions Specialist

Header Right

  • Home
  • About
  • Projects
  • Contact
  • News
  • Home
  • About
  • Projects
  • Contact
  • News
  • Home
  • About
  • Projects
  • Contact
  • News
Walmer Occupational Health and Wellness Centre

Walmer Occupational Health and Wellness Centre

You are here: Home / Projects / Walmer Occupational Health and Wellness Centre
Walmer Occupational Health and Wellness Centre
Walmer Occupational Health and Wellness Centre

This project, which formed part of the Nelson Mandela Metropolitan Municipality’s Integrated Development Plan 2006 – 2011 for the provision of public health facilities, has resulted in a state of the art facility being developed. This facility will be a huge asset to the neighbouring Walmer Township, by enabling them easy access to Medical Facilities.

To ensure that the facility is cost effective and environmentally friendly, a C-Bus system was installed to control the lighting and air-conditioning.

With sensors located throughout the building, lights will be activated whenever someone enters the area. After a certain period of inactivity, the lights will automatically turn off, thereby ensuring that lights do not burn unnecessarily. The sensors are also able to determine the current light levels and should the natural light be above the required level, the lights will turn off.

The air-conditioners were originally going to be managed using timer switches, but Building Automation Systems was able to advise the developers that the C-Bus system was able to control the air-conditioning as well. The air-conditioners will be activated by the same sensors controlling the lights. When no movement is detected in a certain area, the air-conditioners will power down. This all ensures energy savings.

The entire system can be controlled from a Colour Touch screen which was installed at the centre. This simplifies the management of the system.

Share this:

  • LinkedIn
  • Facebook
  • Twitter
  • WhatsApp

Satisfied Clients

Projects Completed by BA Systems:
GROHE SenseGuard

App-Controlled Water Security System

Nelson Mandela Bay Stadium

Nelson Mandela Bay Stadium

East London International Convention Centre

Marine Park Convention Centre

Aliwal North DPW Building

Aliwal North DPW Building

SAPS Radio Control Centre

SAPS Radio Control Centre

Coega IDZ Offices

Coega IDZ Offices

Walmer Occupational Health and Wellness Centre

Walmer Occupational Health and Wellness Centre

Michael Straton

BA Systems National Award as Best Contributor to Energy Efficiency

Campanile Exterior Mandela

Historic Campanile Memorial

Boysen Exhaust Technology

Boysen Exhaust Technology

Livingstone Hospital Oncology

Livingstone Hospital Oncology

Previous Post: «East London International Convention Centre Marine Park Convention Centre
Next Post: Livingstone Hospital Oncology Livingstone Hospital Oncology»
  • Home
  • About
  • Projects
  • Contact
  • News

Copyright © 2019 · Mai Lifestyle Pro on Genesis Framework · WordPress · Log in